Completed
Oil Drilling Equipment
October 2025 - October 2025
TPAO
İskenderun - Kayapınar
Project Overview
A total of 216 pieces of oil drilling equipment for TPAO were safely transported from Iskenderun Port to Diyarbakır through planned logistics execution.
Transport Route
The Challenge
The high number of cargo units and the inland transportation route required detailed operational planning for loading sequence, cargo safety, and scheduling.
Our Solution
-
Key Results
All equipment was delivered safely, on schedule, and without damage, resulting in the successful completion of the operation.